Maturity evaluation model in project management for smes in the graphic arts sector

Authors

DOI:

https://doi.org/10.22335/rlct.v10i2.572

Keywords:

Maturity model, project management, SMEs, graphic arts

Abstract

This paper proposes a model for the evaluation of maturity in project management for SMEs in the graphic arts sector. The results obtained, through the analysis of main components and the analysis of conglomerates, account for the possibility, and necessity, of creating models of maturity that help the business growth of small organizations. The model evaluates 40 indicators that are grouped into 17 factors that, in turn, are grouped into 5 categories.

Downloads

Download data is not yet available.

Author Biographies

  • Álvaro Julio Cuadros López, Universidad del Valle
    Magister en Administración de Empresas. Ingeniero industrial. Especialista en Gestión Tecnológica
  • Camilo Andrés Mican Rincón, Universidad del Valle

    Magister  en  Ingeniería  Industrial.  Ingeniero Industrial

  • Juan Pablo Orejuela Cabrera, Universidad del Valle

    Magister en Ingeniería Industrial. Ingeniero Industrial

References

Aguirre, S., & Córdoba, N. B. (2008). Diagnóstico de la madurez de los procesos en empresas medianas colombianas. Ingeniería Y Universidad, 12(2), 245–267.

Ahlemann, F., Teuteberg, F., & Vogelsang, K. (2009). Project management standards - Diffusion and application in Germany and Switzerland. International Journal of Project Management, 27(3), 292–303. http://doi.org/10.1016/j.ijproman.2008.01.009

Andersen, E. S., & Jessen, S. A. (2003). Project maturity in organisations. International Journal of Project Management, 21(6), 457–461. http://doi.org/10.1016/S0263-7863(02)00088-1.

Arce, S., & López Sierra, H. (2010). Valoración de la gestión de proyectos en empresas de Bogotá. RevistaEscuela de Administración de Negocios, 69(0120-8160), 60–87.

Backlund, F., Chronéer, D., & Sundqvist, E. (2014). Project Management Maturity Models – A Critical Review. Procedia - Social and Behavioral Sciences, 119, 837–846. http://doi.org/10.1016/j.sbspro.2014.03.094

Berssaneti, F. T., & Carvalho, M. M. (2015). Identification of variables that impact project success in Brazilian companies. International Journal of Project Management, 33(3), 638–649. http://doi.org/10.1016/j.ijproman.2014.07.002

BPR Benchmark. (2010). Editorial Sector 2010.

COLOMBIA. Congreso de la República. (2004). Ley 905 de 2004.

Cunha, P. F., & Wiendahl, H.-P. (2005). Knowledge Acquisition from Assembly Operational Data Using Principal Components Analysis and Cluster Analysis. CIRP Annals - Manufacturing Technology, 54(1), 27–30. http://doi.org/10.1016/S0007-8506(07)60042-0

Everitt, B. S., Landau, S., & Leese, M. (2009). Clustering Analysis. Cluster Analysis (4th ed.). John Wiley & Sons, Ltd. Retrieved from http://dx.doi.org/10.1002/9780470977811.ch1

Gray, C., & Larson, E. (2009). Administración de proyectos. (McGrawHill, Ed.) (4th ed.).

Guido, J., & Clements, J. (2007). Administración exitosa de proyectos (3rd ed.). Thomson Editores.

Hair, J., Anderson, R., Tatham, R., & Black, W. (2000). Análisis Multivariante de Datos (5th editio). Prentice Hall.

Jia, G., Ni, X., Chen, Z., Hong, B., Chen, Y., Yang, F., & Lin, C. (2013). Measuring the maturity of risk management in large-scale construction projects. Automation in Construction, 34, 56–66. http://doi.org/10.1016/j.autcon.2012.10.015

Johnson, D. (2000). Métodos multivariados aplicados al análisis de datos. (International Thomson Editores, Ed.).

Judgev, K., & Thomas, J. (2002). Project management maturity models: The silver bullets of competitive advantage. Project Management Journal, 33(4), 4–14.

Kerzner, H. (2009). Project management: a systems approach to planning, scheduling, and controlling. New York. http://doi.org/10.1016/0377-2217(82)90164-3

Kwak, Y. H., Sadatsafavi, H., Walewski, J., & Williams, N. L. (2015). Evolution of project based organization: A case study. International Journal of Project Management, 33(8), 1652–1664. http://doi.org/10.1016/j.ijproman.2015.05.004

Malakooti, B., Malakooti, N. R., & Yang, Z. (2007). Integrated group technology, cell formation, process planning, and production planning with application to the emergency room. International Journal of Production Research, 42(9), 1769–1786. http://doi.org/10.1080/00207540310001652851

Miklosik, A. (2015). Improving Project Management Performance through Capability maturity measurement. Procedia Economics and Finance, 30(15), 522–530. http://doi.org/10.1016/S2212-5671(15)01264-2

Motoa, G., & Solarte, L. (2005). Modelos De Madurez En Gerencia De Proyectos. El Colombian Project Management Maturaty Model (Cp3M©). In 1er. Congreso Iberoamericano de Investigación en Administración (p. 28).

Mutafelija, B., & Stromberg, H. (2003). Systematic process improvement using ISO 9001:2000 and CMMI. Artech House (Vol. 1).

Oltra Mestre, M. . J., & Flor Peris, M. . L. (2007). El efecto de la estrategia de operaciones en los resultados empresariales y su moderación por la estrategia de negocio. Cuadernos de Economía Y Dirección de La Empresa, 10(31), 203–222. http://doi.org/10.1016/S1138-5758(07)70088-9

Perdomo, J., Malaver, F., Rojas, J., & Vega, A. (2002). Metodología de referenciación competitiva en cluster estratégicos regionales Aplicación de cluster de artes gráficas. Centro de Investigaciones para el desarrollo, Universidad Nacional de Colombia. Retrieved from Ministerio de Comercio Exterior

Project Management Institute-PMI. (2012). A guide to the Project Management Body Of Knowledge (5th ed.).

Project Management Institute-PMI. (2013). Organizational Project Management Maturity Model (OPM3) Knowledge Foundation.

Salawu, R. A., & Abdullah, F. (2015). Assessing Risk Management Maturity of Construction Organisations on Infrastructural Project Delivery in Nigeria. Procedia - Social and Behavioral Sciences, 172(2006), 643–650. http://doi.org/10.1016/j.sbspro.2015.01.414

Software Engineering Institute. (2010). CMMI ® para Desarrollo, Versión 1.3.

Solarte-Pazos, L., & Sánchez-Arias, L. F. (2014). Gerencia de proyectos y estrategia organizacional: El modelo de madurez en gestión de proyectos CP3M© V5.0. Innovar, 24(52), 5–18. http://doi.org/10.15446/innovar.v24n52.42502

Souza, T. F. de, & Gomes, C. F. S. (2015). Assessment of Maturity in Project Management: A Bibliometric Study of Main

Models. Procedia Computer Science, 55(Itqm), 92–101. http://doi.org/10.1016/j.procs.2015.07.012

The Office of Government Commerce. (2013). P3M3 – Project Model. Project Management Maturity Model. The Office of Government and Commerce, 1–23. Retrieved from http://tinyurl.com/2vwcp7b

Thun, J.-H. (2008). Empirical analysis of manufacturing strategy implementation. International Journal of Production Economics, 113(1), 370–382. http://doi.org/10.1016/j.ijpe.2007.09.005

Usai, M. G., Casu, S., Molle, G., Decandia, M., Ligios, S., & Carta, A. (2006). Using cluster analysis to characterize the goat farming system in Sardinia. Livestock Science, 104(1-2), 63–76. http://doi.org/10.1016/j.livsci.2006.03.013

Vergel, M., Martínez, J.J. (2015). Filosofía gerencial seis sigma en la gestión universitaria. Face 15(2). 99-106. https://doi.org/10.24054/01204211.v2.n2.2015.1619

Von Wangenheim, C. G., Silva, D. A. da, Buglione, L., Scheidt, R., Prikladnicki, R., Da Silva, D. A., … Prikladnicki, R. (2010). Best practice fusion of CMMI-DEV v1.2 (PP, PMC, SAM) and PMBOK 2008. Information and Software Technology, 52(7), 749–757. http://doi.org/10.1016/j.infsof.2010.03.008

Published

2018-04-01

Issue

Section

Research articles / Original articles

How to Cite

Maturity evaluation model in project management for smes in the graphic arts sector. (2018). Revista Logos Ciencia & Tecnología, 10(2), 39-56. https://doi.org/10.22335/rlct.v10i2.572